Desarrollo de productos SaaS
Soluciones SaaS de extremo a extremo, del MVP a la escala — facturación por suscripción, paneles y arquitectura multiinquilino.
From MVP to scale
We build SaaS products end-to-end: multi-tenant architecture, subscription billing, role-based access, dashboards, admin tooling, and the integrations your customers expect (Slack, email, webhooks, SSO). Most engagements start at MVP and continue into scaled production.
What a typical MVP looks like
We ship a real product in 8–12 weeks, not 8–12 months. The MVP includes authentication, the one feature that's the actual reason your product exists, a billing surface (Stripe), an admin dashboard, basic analytics, and a deployment pipeline. Anything that isn't core to the test gets rented — payments, email, file storage — so we don't burn your runway on solved problems.
The hard parts we own
Multi-tenant data isolation, correct subscription state transitions, idempotent billing webhooks, audit trails, and graceful degradation when a third-party API is down. These are the places most MVPs quietly break — we build them right the first time.
What comes after MVP
Once the product has signal, we help with scaling: database read replicas, background job queues, observability (logs, metrics, traces), feature flags, and the operational maturity that turns "works in staging" into "works at 3am on a Saturday."
Preguntas frecuentes
Can you take over an existing SaaS codebase?
Yes. We frequently inherit products that have outgrown their original architecture. We start with a code audit, document the highest-risk areas, and propose either a refactor or a clean rebuild — with explicit cost/time tradeoffs so you can decide.
Do you handle the billing system?
Yes — Stripe Billing / Lemon Squeezy / Paddle, depending on your tax and SaaS-compliance needs. We handle subscription state, dunning, plan upgrades/downgrades, and reconcile webhook events idempotently.
¿Listo para empezar con desarrollo de productos saas?
Cuéntanos tu proyecto y te respondemos en un día hábil.
Iniciar proyecto
